Fast2test的專家團隊利用他們的經驗和知識終於研究出了關於NCARB PDD 認證考試的培訓資料。我們的NCARB PDD 認證考試培訓資料很受客戶歡迎,這是Fast2test的專家團隊勤勞勞動的結果。他們研究出來的模擬測試題及答案有很高的品質,和真實的考試題目有95%的相似性,是很值得你依賴的。如果你使用了Fast2test的培訓工具,你可以100%通過你的第一次參加的NCARB PDD認證考試。
主題 | 簡介 |
---|---|
主題 1 |
|
主題 2 |
|
主題 3 |
|
主題 4 |
|
主題 5 |
|
最新的NCARB PDD考試是最受歡迎的認證之一,很多考生都沒有信心來獲得此認證,Fast2test保證我們最新的PDD考古題是最適合您需求和學習的題庫資料。無論您是工作比較忙的上班族,還是急需認證考試的求職者,我們的NCARB PDD考古題都適合您們使用,保證100%通過考試。我們還提供一年免費更新服務,一年之內,您可以獲得您所購買的PDD更新后的新版本,這是不錯的選擇!
問題 #93
Refer to the exhibit.
The construction method shown in the detail should be used to prevent cracking in which of the following situations?
答案:D
解題說明:
The detail shows a steel runner with sheetrock and screws, typical for drywall suspended ceiling assemblies.
This construction method is commonly used in concrete frame buildings with drywall ceilings suspended below the structural slab.
It helps prevent cracking by accommodating building movement and separating finish materials from structural movement.
Structural steel frame buildings with plaster ceilings typically have different finish and framing details.
Concrete flat slabs with exposed ceilings have no finish requiring such assemblies.
Exposed steel frames without partitions don't need drywall framing.
Reference:
NCARB ARE 5.0 Review Manual, Materials and Assemblies chapter
Interior finishes and drywall system installation guides (Gypsum Association)
問題 #94
In the critical path method of scheduling for new construction, the site work portion is always on the critical path due to which of the following?
答案:A
解題說明:
In the Critical Path Method (CPM) scheduling, the critical path is the longest sequence of dependent activities that determines the project duration.
Site work typically involves grading, excavation, underground utilities, and foundation preparation.
Site work must proceed in a linear, sequential manner: earthwork must finish before foundation pours; utilities are installed before slabs.
These activities are dependent on each other and cannot be done in parallel or out of order.
Therefore, site work forms a continuous chain of dependent activities on the critical path.
Other options are less relevant to CPM critical path logic:
Site work costs or retainage do not influence CPM scheduling.
Short interval scheduling is a project control technique, not a CPM determinant.
Reference:
NCARB ARE 5.0 Review Manual, Project Management and Scheduling chapter
CPM scheduling principles from project management texts like PMBOK or Construction Planning and Scheduling by Jimmie Hinze
問題 #95
In the design of a barrier-free access route, door locksets should be equipped with which one of the following?
答案:C
解題說明:
For barrier-free (ADA) accessible routes, operable parts such as door hardware must be usable with one hand and not require tight grasping, pinching, or twisting of the wrist (2010 ADA Standards §404.2.7). Lever handles meet this requirement because they can be operated by users with limited grip strength or dexterity.
A). Grip handles with thumbpieces - Often require pinching or twisting; not compliant for barrier-free.
B). Knurled knobs - Non-compliant because they require twisting and strong grip; also typically used for hazardous rooms as a tactile warning.
D). Panic devices - Allowed in certain egress conditions but not the universal ADA hardware requirement for standard accessible doors.
PDD Reference: ARE 5.0 Handbook, PDD "Codes and Regulations-Accessibility," 2010 ADA Standards
§404.2.7, ICC A117.1 Accessibility Standard.
問題 #96
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
* Brewing and distilling will operate year-round.
* Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
* Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
* Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
* Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
* The Market area will feature local farm products and is not conditioned.
* Entire building will be fully sprinklered.
* Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
* Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
* Public water and sewer is not available at the Project Site.
* Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
* Architectural Drawings, including plans, elevations, sections, and schedules
* Consultant Drawings, including structural, HVAC, power distribution, and plumbing
* PEMB Shop Drawings
* Design and Construction Schedule
* Specification Excerpts, showing relevant spec sections
* IBC and ADA Excerpts, showing relevant code and accessibility sections
* After reviewing the documents, the architect discovers a coordination issue in the corridor.
Which modification is required?
答案:A
解題說明:
At 50% CDs with early PEMB coordination and compressed schedule, typical cross-discipline clashes in corridors involve above-ceiling valves/dampers that lack required access from a public space. Plumbing and mechanical codes require accessible, labeled access panels for isolation/shut-off valves (and similar devices) located in concealed spaces so they can be serviced without disrupting operations-critical here because farm work must continue during construction/operation.
Exit sign at door #15 (A) depends on egress analysis; not a generic coordination issue.
Relocate diffusers (B) is a comfort/layout decision, not a compliance coordination issue unless they conflict with lights/sprinklers.
PDD refs: IMC/IPC provisions for access to valves and equipment in concealed spaces; Division 08/10 access panels; ARE 5.0 PDD-Coordination of MEP with architectural ceilings and corridors.
問題 #97
Which of the following best explains the function of Division 01 in the specifications?
答案:A
解題說明:
Division 01 governs administrative procedures across all trades-submittals, project meetings, temporary utilities, etc. It sets the framework for other divisions. Objective 2.1 addresses the structure and function of specifications.
問題 #98
......
您應該尋找那些真實可信的題庫商提供的PDD題庫資料,這樣對您通過考試是更有利,可信度高的NCARB PDD題庫可幫助您快速通過認證考試,而Fast2test公司就是這樣值得您信賴的選擇。PDD題庫資料中的每個問題都由我們專業人員檢查審核,為考生提供最高品質的考古題。如果您希望在短時間內獲得NCARB PDD認證,您將永遠找不到比Fast2test更好的產品了。
PDD認證資料: https://tw.fast2test.com/PDD-premium-file.html
Cookie | Durata | Descrizione |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |